Short answer: The earlier a decision is made, the cheaper it is to change: moving a wall on paper costs nothing, moving a socket after plastering costs a day, and changing a kitchen layout after the units arrive can cost thousands. Lock the layout, then services, then finishes, then furniture.
The decision order
| Order | Decision | Cost of changing later |
|---|---|---|
| 1 | Layout and openings | Very high after structure is built |
| 2 | Services: sockets, lights, water, heating | High after plastering |
| 3 | Kitchen and bathroom specification | Medium once ordered |
| 4 | Finishes: tiles, paint, flooring | Low to medium before fitting |
| 5 | Furniture and decoration | Low |
How to lock a decision
- Draw it, then walk through it in 3D.
- Write it into the scope and sign off with everyone in the household.
- Mark it as closed on the schedule and price any later change before agreeing.
Common traps
- Choosing taps and tiles after the plumber has finished.
- Leaving the kitchen design until after the structural drawings.
- Skipping socket positions because they feel small.
Use a shared plan
A share link opens the room in 3D for anyone without an account, so everyone who lives there can look and comment before the decision is closed.
Frequently asked questions
What is a variation?
A change to the agreed scope, which should be priced in writing before it is carried out.
When should I order a kitchen?
As soon as the layout is fixed and before first fix, because lead times can be long.